Every module below names its sources, because the sources are the product. Subscribers see each one here first, and the monthly brief carries it the day it ships. Something you need that isn’t on this page? Tell us — the queue is honestly first-come.
One row per project, from auction award to commissioning: the LoA list, the CEA under-construction register (both already ingested here), and the granted-connectivity archive behind every substation you track. Watch a project the way you watch a substation today: star it, and every register edition moves its status.
Margins say how much room a substation has left. Curtailment says whether the room is usable. Monthly state-wise renewable curtailment from CEA's monthly RE report and Grid-India's operational data, both public, joined to our node-pressure model: which pressured substations sit in states that already spill generation.
CEA's transmission under-construction list and the TBCB award pipeline say when new substations and lines actually commission. Crossed with our closure brackets, that becomes the calendar of when closed nodes reopen.
The consumption side already sits in registers we hold: Reg 17.1 non-STU draw (25 editions) and the STU one-pagers (32 editions). One view of green-hydrogen and industrial demand building toward the same nodes.
Ten editions of the Reg 24.6 lists are archived. A dated feed of what was revoked, at which node, freeing how much: the may-free-up alert promoted to its own surface, with watchlist tie-in.