INDIA GRID MONITOR — OPEN THE PLATFORM →
Upcoming

What we’re building next, and the data it stands on.

Every module below names its sources, because the sources are the product. Subscribers see each one here first, and the monthly brief carries it the day it ships. Something you need that isn’t on this page? Tell us — the queue is honestly first-come.

In build

the next two modules
in build

RE Projects Tracking

One row per project, from auction award to commissioning: the LoA list, the CEA under-construction register (both already ingested here), and the granted-connectivity archive behind every substation you track. Watch a project the way you watch a substation today: star it, and every register edition moves its status.

Data: REIA 11-SM LoA list · CEA under-construction (6 editions held) · granted-connectivity registers (27 editions)
First cut ships with the next register edition.
design

Grid Curtailment Estimates

Margins say how much room a substation has left. Curtailment says whether the room is usable. Monthly state-wise renewable curtailment from CEA's monthly RE report and Grid-India's operational data, both public, joined to our node-pressure model: which pressured substations sit in states that already spill generation.

Data: CEA monthly RE report · Grid-India operational reports · our margin book
Design done; first cut after the projects tracker.

Under consideration

valuable with data we hold or can get free

Transmission build-out tracker

CEA's transmission under-construction list and the TBCB award pipeline say when new substations and lines actually commission. Crossed with our closure brackets, that becomes the calendar of when closed nodes reopen.

CEA transmission UC register · CTU/PFC TBCB pipeline — public

Demand pipeline by state

The consumption side already sits in registers we hold: Reg 17.1 non-STU draw (25 editions) and the STU one-pagers (32 editions). One view of green-hydrogen and industrial demand building toward the same nodes.

Already ingested — no new data needed

Revocation feed

Ten editions of the Reg 24.6 lists are archived. A dated feed of what was revoked, at which node, freeing how much: the may-free-up alert promoted to its own surface, with watchlist tie-in.

Already ingested — no new data needed